PULL-IN-PLACE™ | Perma-Liner Industries LLC.

PULL-IN-PLACE™ LATERAL LINING SYSTEM 100% TRENCHLESS NO DIGGING UP FLOORS OR LNADSCAPING

pull-in-place

LATERAL PULL IN PLACE

CURED-IN-PLACE-PIPE SMALL DIAMETER REHABILITATION SYSTEM.

The Perma-Liner™ Pull-In-Place Pipelining System is 100% trenchless. No digging up floors, landscaping, or tearing up walls. The versatility of this system allows lining 22’s, 45’s, sweeping 90’s and vertical stacks with ease, while stopping and starting anywhere in the line. Now you can service pipelines from 2" - 8" in diameter in less than a day and in most cases less than 5 hours with the new Perma-Liner™ Pull-In-Place Pipelining System. The Navi-Liner can also be supplied in 4" - 6" transitions without changing the structural properties of the liner.


PULL IN PLACE BENEFITS

  • Ability to start and stop anywhere in the line.
  • Excellent for vertical stacks.
  • 22, 45, AND SWEEPING 90 DEGREE BENDS.
  • Stand Alone Design / No Host Pipe Needed.
  • Bridges Missing Sections of Pipe.
  • Relines Virtually Any Material, Clay, Cast, Etc.
  • ICC Approved.
  • 2”- 8” Diameters.
  • 4”- 6” Transitions can be supplied at any length.
  • 100% Solids Epoxy.
  • 3 hour cure time with ambient resin.
  • Multiple installations per day.

SIMPLE INSTALLATION

  • Clean and televise line.
  • Take measurement of lateral.
  • String a line from your first access point to your second.
  • Wet out the liner.
  • Attach winch cable to the leading edge of liner’s pull end.
  • Attach the air hose and second winch cable to the back air End.
  • Pull the liner into place.