THIS IS THE NEXT LEVEL OF PIPELINE REHABILITATION
Experience The Perma-Liner™ Difference
Perma-Liner™ Industries, Inc. supplies its Pull-In-Place™ installers only certified third party tested and approved lining materials. Our Navi™-Liner and 2-part formulated epoxy resin ensures your company is in accordance with city and state specifications. ASTM F1216 specifications require a minimum life expectancy of 50 years…our Perma-Liner™ Pull-In-Place certified third party testing provides life expectancy 70 years plus!
PULL-IN-PLACE DESIGNED FOR USE IN 8" DIAMETER OR SMALLER PIPELINES
The Perma-Liner Pull In Place System was designed for use in 8” diameter and smaller pipelines. It can rehabilitate lines down to a size of 2”. The liner can negotiate 22, 45, and sweeping 90° bends with ease. Jobs can usually be completed within a half days work.
The system uses a needled felt coated liner that is saturated with 100% solids epoxies and inflated using an internal bladder. The bladder is already strung in the liner from the manufacturer. All that is needed is liner saturation and insertion into the pipeline and the job is complete. The epoxy is ambient cured in less than three hours; therefore no secondary heat source is needed.
The system can be used to line a continuous run of pipe, or multiple runs of pipe. This allows the Perma-Liner Pull In Place installer the ability to line a pipe and skip the lateral connections. This system is perfect for interior drain work, under slab work, pipe requiring multiple reinstatements.
PULL-IN-PLACE ADVANTAGES
Features & Benefits of our Perma-Lateral Pull In Place System
- 100% Trenchless
- Formulated Epoxy Resins
- Re-Line 22's, 45's & Sweeping 90's
- NSF Standard 14 Approved
- Eliminate Root Intrusion
- Bridge Missing Pipe Sections
- Increase Flow Efficiency
- Minimum Design Life 50 Years (Tested)
- Non-Woven / No Stretch Liner
- Seal Open Joints
- Prevent Pipe Failure
- Reline 4" to 6" Transitions
- Stop Infiltration / Ex-Filtration
- IAPMO Certified

|
PULL-IN-PLACE SPECIFICATIONS
Consistant Installations!
Perma-Liner™ Industries, Inc. has spent years of research and development in order to furnish you quality materials and proven installation methods. Both municipal government agencies and private owners of building sewer laterals expect this quality in every project. To ensure this quality is consistent in every application, Perma-Liner™ has installation and material specifications for our Perma-Liner™ Pull-In-Place Certified Installers to follow. The specifications are used by municipal government agencies throughout the world for contracting services.
Our Pulled-in-Place™ 3rd party testing exceeds the industries standards as per ASTM F1216. The installation practices set forth in our specifications will guarantee your company or agency consistent results…every time!
Please contact us for an up-to-date list of Perma-Liner™ Certified Installers in your area. |
| |
|
 |
3rd Party Testing Download Documentation
Download any of our 3rd Party Testing Documents Below:
The Pull-In-Place 3rd party testing documents are available for download. These are .PDF files that can easily be saved to your computer for future use. Your web browser will open these files as a friendly web page. For any questions concerning our documentation, please contact us. We will be happy to assist you.
|
|